Tank terminal project
For the 2018 Belgian Tank Terminal project, Hanwel provided a comprehensive delivery of as many as 25,000 pipe supports, spread over a stretch of 80 km of piping and divided into fifteen structured deliveries.
The challenge
The 2018 Belgian Tank Terminal project required a large delivery for 80km of pipe, consisting of 25,000 DN250 pipe supports spread over fifteen deliveries.
How did Hanwel help?
All supports were produced, packed and shipped in a specific order throughout the project. The pallets were then labeled according to the specific isos so that it was clear on-site which delivery was intended for which pipeline. The goods were carefully inspected and placed on the truck from Hanwel's warehouse ready for departure.
Guide clamps were used on the long, straight pipe sections to limit and control the movement of the pipe.
The result
- No holes or welding on the existing steel structures
- No damage to paint or galvanization
- No fire work permit required
- Applicable to different profile types
- Deployable for a wide range of pipe diameters
- Quick assembly/disassembly
- Already performed in Hot Dip Galva
- Sustainable
- No welding equipment to install in difficult locations, thus cost-saving